Time: 9:00 AM
Address: (Northeast)
16.448309, 102.731516
Tools that must be brought during training:Tools Detail
NOE Class Room A | ||||
Day | Course Name | Time | Trainer | Subject |
Day 1, Theoretical knowledge learning, online course content supplement and explanation | Register for training | 08:30~09:00 | Pawin | 1.Sign-in 2.Check Tools &PPE Equipment |
General Site introduction | 09:00~09:30 | Praichit | 1.Tower type introduction_15mins 2.Equipment support or Platform introduction_10mins 3.Site type introduction_5mins | |
General Equipment introduction | 09:30~10:30 | Praichit | 1.Overview introduction_5mins 2.Cabinet&BBU&Reciticfier&DCDU&Battery Equipment introduction_20mins 3.RRU&Antenna&AAU&DPS&RET&Combiner Equipment introduction_20mins 4.Cable &Connector&SFP&Auxiliary introduction_15mins | |
Merge Scenario introduction with SOP | 10:30~11:30 | Praichit | 1.Merge Scenario introduction(Paired/Unpaired/Modernization/Upgrade/Swap/Relocate)_10mins 2.Topical scenario 1 SOP introduction_25mins 3.Topical scenario 2 SOP introduction_25mins | |
Installation Tools introduction | 11:30~12:00 | Pawin | 1. General tools introduction_15mins 2. Professional tools introduction_15mins | |
Launch Time Break | 12:00~13:30 | |||
Installation standard Procedure & Key point | 13:30~15:30 | Pawin | 1.Flow chart for TE installation introduction_20mins 2.RRU installation standard introduction_15mins 3.AAU installation standard introduction_15mins 4.Antenna installation standard introduction_10mins 5.Cabinet installation standard introduction_10mins 6.BBU installation standard introduction_10mins 7.DCDU installation standard introduction_5mins 8.Battery installation standard introduction_10mins 9.lifting procedure introduction_15mins 10.Huawei Redline introduction_10mins | |
General EHS | 15:30~16:30 | Pachara | 1.EHS certificates introduction_5mins 2.Huawei EHS requirement introduction_5mins 3.EHS selfcheck flow chart for on site operation_10mins 4.PPE standard introduction_5mins 5.Work at height safety introduction_10mins 6.Work with Electrical safety introduction_5mins 7.first aid introduction_5mins 8.Huawei EHS Redline_5mins 9.Cyber security introduction_10mins | |
THCP Operation | 16:30~17:30 | Pachara | 1.What is 5S introduction_10mins 2.Apps installation introduction_5mins 3.General operation introduction_5mins 4.Clockin operation introduction_10mins 5.Site sign operation introduction_10mins 6.Site verify operation introduction_10mins 7.QC operation introduction_10mins | |
Day 2, operation practice, form equipment install to team cooperation to solution drilling | Register for training | 08:30~09:00 | Pawin | 1.Sign-in 2.Check Tools &PPE Equipment |
Team_A: ISDP Operation Practice | 09:00~10:00 | Pachara | 1.Install Apps_5mins 2.Site clock practice_5mins 3.Site sign practice_10mins 4.Site verify practice_15mins 5.Smart QC practice_25mins | |
Team_B: EHS Operation Practice | Pachara | 1.Install Apps_5mins 2.PPE wearing practice_20mins 3.EHS task operation practice_15mins 4.Climbing practice_20mins | ||
Team_A: EHS Operation Practice | 10:00~11:00 | Pachara | 1.Install Apps_5mins 2.PPE wearing practice_20mins 3.EHS task operation practice_15mins 4.Climbing practice_20mins | |
Team_B: ISDP Operation Practice | Pachara | 1.Install Apps_5mins 2.Site clock practice_5mins 3.Site sign practice_10mins 4.Site verify practice_15mins 5.Smart QC practice_25mins | ||
All Team: New Tools introduction | 11:00~12:00 | Pawin | 1.Electric winch introduction_20mins 2.Lift bracket introduction_20mins 3.Rope climbing machine introduction_20mins | |
Launch Time Break | 12:00~13:30 | |||
Team_A: Installation standard Procedure Practice | 13:30~15:30 | Pawin | 1.Install 1 sector antenna&RRU_60mins 2.Dismantle 1 sector antenna&RRU_45mins 3.Change antenna&RRU layer with new design_45mins 4.BBU Broad swap and transmission cable swap_20mins 5.battery install_20mins 6.battery dismantle_20mins | |
Team_B: Installation Standard Skill Practice | Pawin | 1.OT Terminate making_20mins 2.RRU power connector making_25mins 3.Jumper connector water proof_20mins 4.DC power cable connect_15mins 5.DCDU/BBU/Breaker/Rectifier install_50mins 6.Lable making_10mins 7.Grounding install_10mins 8.Sensors cable connect_20mins 9.cable laying(indoor/outdoor)_25mins 10.battery install_15mins | ||
Team_A: Installation Standard Skill Practice | 15:30~17:30 | Pawin | 1.OT Terminate making_20mins 2.RRU power connector making_25mins 3.Jumper connector water proof_20mins 4.DC power cable connect_15mins 5.DCDU/BBU/Breaker/Rectifier install_50mins 6.Lable making_10mins 7.Grounding install_10mins 8.Sensors cable connect_20mins 9.cable laying(indoor/outdoor)_25mins 10.battery install_15mins | |
Team_B: Installation standard Procedure Practice | Pawin | 1.Install 1 sector antenna&RRU_60mins 2.Dismantle 1 sector antenna&RRU_45mins 3.Change antenna&RRU layer with new design_45mins 4.BBU Broad swap and transmission cable swap_20mins 5.battery install_20mins 6.battery dismantle_20mins | ||
Day 3, examinations of operation part to ensure team are able to start installation | Register for training | 08:30~09:00 | Pawin | |
Team_A: Installation standard Procedure Practice | 09:00~10:30 | Pawin | 1.Install 1 sector antenna&RRU_60mins 2.Dismantle 1 sector antenna&RRU_45mins 3.Change antenna&RRU layer with new design_45mins 4.BBU Broad swap and transmission cable swap_20mins 5.battery install_20mins 6.battery dismantle_20mins | |
Team_B: Installation Standard Skill Practice | Pawin | 1.OT Terminate making_20mins 2.RRU power connector making_25mins 3.Jumper connector water proof_20mins 4.DC power cable connect_15mins 5.DCDU/BBU/Breaker/Rectifier install_50mins 6.Lable making_10mins 7.Grounding install_10mins 8.Sensors cable connect_20mins 9.cable laying(indoor/outdoor)_25mins 10.battery install_15mins | ||
Team_A: Installation Standard Skill Practice | 10:30~12:00 | Pawin | 1.OT Terminate making_20mins 2.RRU power connector making_25mins 3.Jumper connector water proof_20mins 4.DC power cable connect_15mins 5.DCDU/BBU/Breaker/Rectifier install_50mins 6.Lable making_10mins 7.Grounding install_10mins 8.Sensors cable connect_20mins 9.cable laying(indoor/outdoor)_25mins 10.battery install_15mins | |
Team_B: Installation standard Procedure Practice | Pawin | 1.Install 1 sector antenna&RRU_60mins 2.Dismantle 1 sector antenna&RRU_45mins 3.Change antenna&RRU layer with new design_45mins 4.BBU Broad swap and transmission cable swap_20mins 5.battery install_20mins 6.battery dismantle_20mins | ||
Launch Time Break | 12:00~13:30 | |||
Team_A: THCP operation Examination | 13:30~14:00 | Pachara | 1.Complete site clock_5mins 2.Complete site sign_5mins 3.Complete site verify_5mins 4.Complete smart QC task_15mins | |
Team_B: EHS Operation Examination | Pawin | 1.Complete EHS task_30mins | ||
Team_A: EHS Operation Examination | 14:00~14:30 | Pachara | 1.Complete EHS task_30mins | |
Team_B: THCP operation Examination | Pawin | 1.Complete site clock_5mins 2.Complete site sign_5mins 3.Complete site verify_5mins 4.Complete smart QC task_15mins | ||
Team_A: Hardware Install Quality Examination | 14:30~16:00 | Pachara | 1.Complete RRU jumper to the antenna port_30mins 2.Complete RRU power cable to DCDU_30mins 3.install a BBU with transmission cable to ATN with the correct label_30mins | |
Team_B: Installation Standard Procedure Examination | Pawin | 1.Install 1 sector antenna&RRU to tower_50mins 2.Swap RRU_20mins 3.dismantle 1 sector antenna&RRU down_20mins | ||
Team_A: Installation Standard Procedure Examination | 16:00~17:30 | Pachara | 1.Install 1 sector antenna&RRU to tower_50mins 2.Swap RRU_20mins 3.dismantle 1 sector antenna&RRU down_20mins | |
Team_B: Hardware Install Quality Examination | Pawin | 1.Complete RRU jumper to the antenna port_30mins 2.Complete RRU power cable to DCDU_30mins 3.install a BBU with transmission cable to ATN with the correct label_30mins |