Course ID: 1098

[New Team] (Bangkok) Classroom A

Time:
3 Day 2024-01-17 09:00 --- 2024-01-19 18:00:00
Registering start time:
2023-12-18 09:00
Registering end time:
2024-01-14 17:00
Registration restrictions:
0/20 person Export
register not start or already registered
Detailed Information

Time: 9:00 AM

Address: (Bangkok)

187/44 Soi Serithai, 25 Seri Thai Rd, Klongkhum, Bueng Kum, Bangkok 10240, Thailand

Tools that must be brought during training:Tools Detail



BKK Class Room A
DayCourse NameTimeTrainerSubject
Day 1, Theoretical knowledge learning, online course content supplement and explanationRegister for training08:30~09:00Pawin1.Sign-in
2.Check Tools &PPE Equipment
General Site introduction09:00~09:30Praichit1.Tower type introduction_15mins
2.Equipment support or Platform introduction_10mins
3.Site type introduction_5mins
General Equipment introduction09:30~10:30Praichit1.Overview introduction_5mins
2.Cabinet&BBU&Reciticfier&DCDU&Battery Equipment introduction_20mins
3.RRU&Antenna&AAU&DPS&RET&Combiner Equipment introduction_20mins
4.Cable &Connector&SFP&Auxiliary introduction_15mins
Merge Scenario introduction with SOP10:30~11:30Praichit1.Merge Scenario introduction(Paired/Unpaired/Modernization/Upgrade/Swap/Relocate)_10mins
2.Topical scenario 1 SOP introduction_25mins
3.Topical scenario 2 SOP introduction_25mins
Installation Tools introduction11:30~12:00Pawin1. General tools introduction_15mins
2. Professional tools introduction_15mins
Launch Time Break12:00~13:30

Installation standard  Procedure & Key point13:30~15:30Pawin1.Flow chart for TE installation introduction_20mins
2.RRU installation standard introduction_15mins
3.AAU installation standard introduction_15mins
4.Antenna installation standard introduction_10mins
5.Cabinet installation standard introduction_10mins
6.BBU installation standard introduction_10mins
7.DCDU installation standard introduction_5mins
8.Battery installation standard introduction_10mins
9.lifting procedure introduction_15mins
10.Huawei Redline introduction_10mins
General EHS15:30~16:30Pachara1.EHS certificates introduction_5mins
2.Huawei EHS requirement introduction_5mins
3.EHS selfcheck flow chart for on site operation_10mins
4.PPE standard introduction_5mins
5.Work at height safety introduction_10mins
6.Work with Electrical safety introduction_5mins
7.first aid introduction_5mins
8.Huawei EHS Redline_5mins
9.Cyber security introduction_10mins
THCP Operation16:30~17:30Pachara1.What is 5S introduction_10mins
2.Apps installation introduction_5mins
3.General operation introduction_5mins
4.Clockin operation introduction_10mins
5.Site sign operation introduction_10mins
6.Site verify operation introduction_10mins
7.QC operation introduction_10mins
Day 2, operation practice, form equipment install to team cooperation to solution drillingRegister for training08:30~09:00Pawin1.Sign-in
2.Check Tools &PPE Equipment
Team_A: ISDP Operation Practice09:00~10:00Pachara1.Install Apps_5mins
2.Site clock practice_5mins
3.Site sign practice_10mins
4.Site verify practice_15mins
5.Smart QC practice_25mins
Team_B: EHS Operation PracticePachara1.Install Apps_5mins
2.PPE wearing practice_20mins
3.EHS task operation practice_15mins
4.Climbing practice_20mins
Team_A: EHS Operation Practice10:00~11:00Pachara1.Install Apps_5mins
2.PPE wearing practice_20mins
3.EHS task operation practice_15mins
4.Climbing practice_20mins
Team_B: ISDP Operation PracticePachara1.Install Apps_5mins
2.Site clock practice_5mins
3.Site sign practice_10mins
4.Site verify practice_15mins
5.Smart QC practice_25mins
All Team: New Tools introduction11:00~12:00Pawin1.Electric winch introduction_20mins
2.Lift bracket introduction_20mins
3.Rope climbing machine introduction_20mins
Launch Time Break12:00~13:30

Team_A: Installation standard  Procedure Practice13:30~15:30Pawin1.Install 1 sector antenna&RRU_60mins
2.Dismantle 1 sector antenna&RRU_45mins
3.Change antenna&RRU layer with new design_45mins
4.BBU Broad swap and transmission cable swap_20mins
5.battery install_20mins
6.battery dismantle_20mins
Team_B: Installation Standard Skill PracticePawin1.OT Terminate making_20mins
2.RRU power connector making_25mins
3.Jumper connector water proof_20mins
4.DC power cable connect_15mins
5.DCDU/BBU/Breaker/Rectifier install_50mins
6.Lable making_10mins
7.Grounding install_10mins
8.Sensors cable connect_20mins
9.cable laying(indoor/outdoor)_25mins
10.battery install_15mins
Team_A: Installation Standard Skill Practice15:30~17:30Pawin1.OT Terminate making_20mins
2.RRU power connector making_25mins
3.Jumper connector water proof_20mins
4.DC power cable connect_15mins
5.DCDU/BBU/Breaker/Rectifier install_50mins
6.Lable making_10mins
7.Grounding install_10mins
8.Sensors cable connect_20mins
9.cable laying(indoor/outdoor)_25mins
10.battery install_15mins
Team_B: Installation standard  Procedure PracticePawin1.Install 1 sector antenna&RRU_60mins
2.Dismantle 1 sector antenna&RRU_45mins
3.Change antenna&RRU layer with new design_45mins
4.BBU Broad swap and transmission cable swap_20mins
5.battery install_20mins
6.battery dismantle_20mins
Day 3, examinations of operation part to ensure team are able to start installation Register for training08:30~09:00Pawin
Team_A: Installation standard  Procedure Practice09:00~10:30Pawin1.Install 1 sector antenna&RRU_60mins
2.Dismantle 1 sector antenna&RRU_45mins
3.Change antenna&RRU layer with new design_45mins
4.BBU Broad swap and transmission cable swap_20mins
5.battery install_20mins
6.battery dismantle_20mins
Team_B: Installation Standard Skill PracticePawin1.OT Terminate making_20mins
2.RRU power connector making_25mins
3.Jumper connector water proof_20mins
4.DC power cable connect_15mins
5.DCDU/BBU/Breaker/Rectifier install_50mins
6.Lable making_10mins
7.Grounding install_10mins
8.Sensors cable connect_20mins
9.cable laying(indoor/outdoor)_25mins
10.battery install_15mins
Team_A: Installation Standard Skill Practice10:30~12:00Pawin1.OT Terminate making_20mins
2.RRU power connector making_25mins
3.Jumper connector water proof_20mins
4.DC power cable connect_15mins
5.DCDU/BBU/Breaker/Rectifier install_50mins
6.Lable making_10mins
7.Grounding install_10mins
8.Sensors cable connect_20mins
9.cable laying(indoor/outdoor)_25mins
10.battery install_15mins
Team_B: Installation standard  Procedure PracticePawin1.Install 1 sector antenna&RRU_60mins
2.Dismantle 1 sector antenna&RRU_45mins
3.Change antenna&RRU layer with new design_45mins
4.BBU Broad swap and transmission cable swap_20mins
5.battery install_20mins
6.battery dismantle_20mins
Launch Time Break12:00~13:30

Team_A: THCP operation Examination13:30~14:00Pachara1.Complete site clock_5mins
2.Complete site sign_5mins
3.Complete site verify_5mins
4.Complete smart QC task_15mins
Team_B: EHS Operation ExaminationPawin1.Complete EHS task_30mins
Team_A: EHS Operation Examination14:00~14:30Pachara1.Complete EHS task_30mins
Team_B: THCP operation ExaminationPawin1.Complete site clock_5mins
2.Complete site sign_5mins
3.Complete site verify_5mins
4.Complete smart QC task_15mins
Team_A: Hardware Install Quality Examination14:30~16:00Pachara1.Complete RRU jumper to the antenna port_30mins
2.Complete RRU power cable to DCDU_30mins
3.install a BBU with transmission cable to ATN with the correct label_30mins
Team_B: Installation Standard  Procedure ExaminationPawin1.Install 1 sector antenna&RRU to tower_50mins
2.Swap RRU_20mins
3.dismantle 1 sector antenna&RRU down_20mins
Team_A: Installation Standard  Procedure Examination16:00~17:30Pachara1.Install 1 sector antenna&RRU to tower_50mins
2.Swap RRU_20mins
3.dismantle 1 sector antenna&RRU down_20mins
Team_B: Hardware Install Quality ExaminationPawin1.Complete RRU jumper to the antenna port_30mins
2.Complete RRU power cable to DCDU_30mins
3.install a BBU with transmission cable to ATN with the correct label_30mins





[New Team] (Bangkok) Classroom A

3

[New Team] (Bangkok) Classroom AConfirm registration

SubCon Name:
Team No. Name List Tel No. ID Card No. Certificate Available Huawei THCP Position Remark
EHS Height Electrical